Skip to main content

Table 2 FMEA probability evaluation matrix for controls.

From: Cryogenic control system operational experience at SNS

Ranking the Probability for Software Controls

Rank

Known bug likely to occur in one month.

10

Know bug likely to occur in 3–6 months.

7

Known bug likely to occur in 1–3 years.

4

Processor/module has SNS controls standardized version of software.

1

Ranking the Probability for Hardware Controls

Rank

Known hardware defect.

10

Mean time to failure in 3–6 months.

7

Mean time to failure to in 1–3 years.

4

Processor/module has SNS controls standardized version of hardware in manufacturer’s intended environment.

1